Arch Construction Animation

Fully bonded structural arch with hidden stainless steel lintels

Reinforced Brick Cladding

SAFESECURE®  Secure retention of facing bricks in all situations.

Sign Up To Our Bulletin

The office and home, with its ‘hidden’ door built into the brickwork of an existing wall won the 2012 AJ Small Projects Awards and was described by the judges as ‘delightful’.

 The supplied bricks were cut and bonded to the steel door.

 

cut and bonded bricks

 

Featured Clients

Elizabeth Garrett Anderson Hospital

The hospital was completed in 1890 and remained as a hospital until 2000.

After lying derelict, it was repaired and refurbished for its current use as part of the Unison Centre.

St Pancras Renaissance Hotel

After a  decade-long transformation the Midland Grand hotel, the Victorian palace attached to St Pancras station, was returned it to its original luxury in 2011.

Central London School of Ballet

Eight and twelve storey steel blocks comprise this ballet school and student residence. The rain screen façade has square terracotta tubes set horizontally in bays, each bay formed from random lengths and colours of tube.

The Old Workshop, London

The office and home, with its ‘hidden’ door built into the brickwork of an existing wall won the 2012 AJ Small Projects Awards and was described by the judges as ‘delightful’.

St Pancras Station

brick archesWest Elevation arches were set out & hand cut at Bulmer's workshops. The project won 4 titles and high praise from Judges at the 2006 Brick Awards. The Renaissance Hotel was completed in 2010 in similar style and quality.

Granary Wharf Chelsea

This prestigious development in Lots Road, Chelsea features structural segmental brick arch lintels supplied with calculations to meet building control regulations.