The redevelopment of a corner site at Old Street / Silicon Roundabout included a tower and low-rise buildings.
The end elevations carried large steel ventilation ducts which were to be clad in brickwork to replicate the appearance of the wet laid facades. To ensure safety and retention of the cladding over the building design life, the ducts were clad in the SafeSecure® system using slips cut from the same brick type.
STOP PRESS OCTOBER 2018: This project was shortlisted in the 2018 Brick Awards
The same wet laid appearance was achieved on the brick clad piers between the long window runs around the building.

Arch Construction Animation
Reinforced Brick Cladding
The two landmark Towers nestle between Shoreditch Park and the Regents Canal in Hackney, east London. Bulmer Brick Cutting Services are responsible for twelve of the fifteen brick related products being supplied and installed at these striking new tower blocks, as well as several ancillary items and fittings.