Arch Construction Animation

Fully bonded structural arch with hidden stainless steel lintels

Reinforced Brick Cladding

SAFESECURE®  Secure retention of facing bricks in all situations.

Sign Up To Our Bulletin

Bromley Road is a residential block for which Brick Cutters produced 36 brick clad hanging soffit hidden stainless steel lintels to balconies and openings, several thousand plain cuts, pistol stretchers and cut & bonded external angles.

Lee Marley Brickwork received the Specialist Brickwork Contractor of the Year in the 2014 Brick Awards for projects including Bromley Road and Bekynton Field.

The judges commented on the impressive “precision and accuracy which consistently ran through all projects” and to which Brick Cutters contributed.

 

Featured Clients

Bekynton Field, Eton College

Bekynton Field is the largest new development at Eton College since it was founded.

The £19 million development includes 40 new classrooms for modern languages, economics and politics, as well as a lecture theatre and exhibition space.

It features conservation-grade brickwork as well as stonework features and more than 80 brick arches.

Draycott House, Chelsea

This fine example of carved brickwork is for Draycott House in Chelsea. Brick Cutters prepared and supplied the fully washed rubbers, and shared the bricklaying role for the fine jointed ashlar work with the brick carvers, Daniel Mundy and colleagues.

Jafar Hall, Eton College

This award winning project features conservation grade brickwork as well as stonework features and more than 80 brick arches for which Brick Cutters produced 28 of the more complicated arches.

Central London School of Ballet

Eight and twelve storey steel blocks comprise this ballet school and student residence. The rain screen façade has square terracotta tubes set horizontally in bays, each bay formed from random lengths and colours of tube.

Palace House Mansions, Newmarket

Restoration of the Grade 1 Listed mansion of King Charles II revealed very early examples of rubbed & gauged arches. Unwashed clay blocks were cut to match the original arches which were laid in lime using traditional methods.