Arch Construction Animation

Fully bonded structural arch with hidden stainless steel lintels

Reinforced Brick Cladding

SAFESECURE®  Secure retention of facing bricks in all situations.

Sign Up To Our Bulletin

The office and home, with its ‘hidden’ door built into the brickwork of an existing wall won the 2012 AJ Small Projects Awards and was described by the judges as ‘delightful’.

 The supplied bricks were cut and bonded to the steel door.

 

cut and bonded bricks

 

Featured Clients

Elizabeth Garrett Anderson Hospital

The hospital was completed in 1890 and remained as a hospital until 2000.

After lying derelict, it was repaired and refurbished for its current use as part of the Unison Centre.

Jafar Hall, Eton College

This award winning project features conservation grade brickwork as well as stonework features and more than 80 brick arches for which Bulmer Brick Cutting produced 28 of the more complicated arches.

St Pancras Renaissance Hotel

After a  decade-long transformation the Midland Grand hotel, the Victorian palace attached to St Pancras station, was returned it to its original luxury in 2011.

Bekynton Field, Eton College

Bekynton Field is the largest new development at Eton College since it was founded.

The £19 million development includes 40 new classrooms for modern languages, economics and politics, as well as a lecture theatre and exhibition space.

It features conservation-grade brickwork as well as stonework features and more than 80 brick arches.

Central London School of Ballet

Eight and twelve storey steel blocks comprise this ballet school and student residence. The rain screen façade has square terracotta tubes set horizontally in bays, each bay formed from random lengths and colours of tube.